Sarıhıdır Weir and Hydropower PlantNevşehir
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Design and site consultancy services for Sarıhıdır Weir and Hydropower Plant in Avanos, Nevşehir. The archived detailed design records an inflatable weir with a crest height of 3.60 m and an installed capacity of 6.40 MW.
3.60 mWeir height
Inflatable weirWeir type
6.40 MWInstalled capacity