Bağıştaş 1 Dam and Hydropower Plant — project photograph
04 / PROJECT DETAIL

Bağıştaş 1 Dam and Hydropower PlantErzincan

Lasting value in water infrastructure.

Project type
Hydropower
Service
Project consultancy
ABOUT THE PROJECT

Safe design. Long-term value.

Project consultancy for Bağıştaş 1 Dam and Hydropower Plant on the Karasu branch of the Euphrates in İliç, Erzincan. IC İçtaş’s technical record lists 140.62 MW installed capacity and average annual generation of 431 million kWh.

140.62 MWInstalled capacity — operator record
431 GWhAverage annual generation
Project consultancyService
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of a concrete dam, spillway and water structures