Project consultancy for Bağıştaş 1 Dam and Hydropower Plant on the Karasu branch of the Euphrates in İliç, Erzincan. IC İçtaş’s technical record lists 140.62 MW installed capacity and average annual generation of 431 million kWh.
140.62 MWInstalled capacity — operator record
431 GWhAverage annual generation
Project consultancyService
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.