HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
03 / PROJECTS

Lasting work.
Across Türkiye.

Our experience in planning, feasibility, final and detailed design contributes to the sustainable management of water resources.

Click a province or marker. Use arrow keys to move between markers, then Enter or Space to select. Scroll the map after zooming.

Explore marked provinces47 locations · 106 projects

Select a province or marker to explore its projects.

223 projects

Kelebek Barajı — enhanced view based on the reference photograph
Dams / Irrigation

Kelebek Dam

Ahmetli / Manisa, Türkiye

Final design for a roller-compacted concrete irrigation dam in Manisa. The design assignment was completed in 2010.

Porsuk Sarısu Taşkın Geciktirme Projesi — enhanced view based on the reference photograph
Flood control

Porsuk Sarısu Flood Detention Project

Eskişehir, Türkiye

Engineering design for temporary detention of Sarısu flows and reduction of flood risk along the Porsuk Stream through Eskişehir. Hidromark’s archive records completion of the design assignment in 2012; this is not a commissioning date for the structure.

Engineering illustration of an earthfill reservoir and irrigation outlet
Small dams / Irrigation

Konya Meram Yeşiltekke Small Dam and Irrigation

Meram / Konya, Türkiye

Design services for Yeşiltekke Small Dam and its irrigation system in Meram, Konya. Hidromark’s archive records design completion in 2011; DSİ operating records list commissioning of the small dam and its 117-hectare irrigation scheme in 2013.

Engineering presentation illustration derived from the structural geometry in the archival drawings
Dams / Irrigation

Kıbrıs Dam

Silvan / Diyarbakır, Türkiye

Final design for a clay-core earthfill irrigation dam in Diyarbakır. The design assignment was completed in 2010.

Burdur Havza Master Planı — enhanced view based on the reference photograph
Planning

Burdur Basin Master Plan

Burdur, Türkiye

Preparation of a master plan report for assessment and development of water resources in the Burdur Basin. Commissioned under DSİ’s Department of Investigation, Planning and Allocations, the assignment began in 2015 and was completed in 2017 according to Hidromark’s archive.

Conceptual field illustration of water infrastructure engineering

In every project
the same responsibility.

Protecting water resources is our responsibility to future generations.

Explore our services