
04 / PROJECT DETAIL
Porsuk Sarısu Flood Detention ProjectEskişehir
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Engineering design for temporary detention of Sarısu flows and reduction of flood risk along the Porsuk Stream through Eskişehir. Hidromark’s archive records completion of the design assignment in 2012; this is not a commissioning date for the structure.
2012Design completion — archive
Flood detention designService
Flood managementEngineering discipline
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Catchment and flood behaviour
Integrated assessment of flow conditions, flood propagation and the areas requiring protection.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

