HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Porsuk Sarısu Taşkın Geciktirme Projesi — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Porsuk Sarısu Flood Detention ProjectEskişehir

Lasting value in water infrastructure.

Project type
Flood management
Service
Flood detention design
Design service
2012
ABOUT THE PROJECT

Safe design. Long-term value.

Engineering design for temporary detention of Sarısu flows and reduction of flood risk along the Porsuk Stream through Eskişehir. Hidromark’s archive records completion of the design assignment in 2012; this is not a commissioning date for the structure.

2012Design completion — archive
Flood detention designService
Flood managementEngineering discipline
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Catchment and flood behaviour

    Integrated assessment of flow conditions, flood propagation and the areas requiring protection.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering presentation illustration derived from the structural geometry in the archival drawings