
04 / PROJECT DETAIL
Burdur Basin Master PlanBurdur
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Preparation of a master plan report for assessment and development of water resources in the Burdur Basin. Commissioned under DSİ’s Department of Investigation, Planning and Allocations, the assignment began in 2015 and was completed in 2017 according to Hidromark’s archive.
2015–2017Assignment period — archive
Basin master plan reportService
Basin planningEngineering discipline
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Basin-scale analysis
Assessment of water resources, sectoral demand and development alternatives across the catchment.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

