HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Burdur Havza Master Planı — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Burdur Basin Master PlanBurdur

Lasting value in water infrastructure.

Project type
Basin planning
Service
Basin master plan report
Design service
2017
ABOUT THE PROJECT

Safe design. Long-term value.

Preparation of a master plan report for assessment and development of water resources in the Burdur Basin. Commissioned under DSİ’s Department of Investigation, Planning and Allocations, the assignment began in 2015 and was completed in 2017 according to Hidromark’s archive.

2015–2017Assignment period — archive
Basin master plan reportService
Basin planningEngineering discipline
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Basin-scale analysis

    Assessment of water resources, sectoral demand and development alternatives across the catchment.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of catchment topography, river networks and water planning