HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
04 / PROJECT DETAIL

Mostar Hydropower Capacity Expansion and Hybrid Solar Design

Lasting value in water infrastructure.

Project type
Hydropower
Service
Capacity expansion and hybrid solar design
Status
Ongoing
ABOUT THE PROJECT

Safe design. Long-term value.

Capacity expansion and hybrid solar design work is ongoing for Mostar Elektrik Üretim’s Koçköprü Dam, Malazgirt, Ahlat, Adilcevaz and Varto hydropower projects.

Koçköprü Barajı, Malazgirt, Ahlat, Adilcevaz ve Varto HESFacilities
Capacity expansion and hybrid solar designService
HydropowerEngineering discipline
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an intake, penstock and hydropower plant