HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Midi Atık Depolama Tesisi — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Midi Tailings Storage FacilityGümüşhane

Lasting value in water infrastructure.

Project type
Tailings storage
Service
Final and detailed designs
Client
Yıldızlar SSS Holding
ABOUT THE PROJECT

Safe design. Long-term value.

Final and detailed designs for the Midi Tailings Storage Facility in Şiran, Gümüşhane. The mine tailings dam developed for Yıldızlar SSS Holding has a recorded design height of 41 m.

41 mTailings dam height
Final and detailed designsService
Tailings storageEngineering discipline
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Storage and safety

    Integrated consideration of site conditions, storage geometry and water management.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of tailings storage, drainage and embankment sections