04 / PROJECT DETAIL
Kasımlar Dam and Hydropower PlantIsparta
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Feasibility, revised feasibility and final design services for Kasımlar Dam and Hydropower Plant in Isparta. The operator describes the Kasımlar I–II scheme as 100 MW, with two powerhouses, two weirs, a 90 m RCC dam and 15 km of tunnels.
90 mRCC dam height — operator record
100 MWInstalled capacity — I–II scheme
15 kmTotal tunnel length
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.