Kasımlar Barajı ve HES — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Kasımlar Dam and Hydropower PlantIsparta

Lasting value in water infrastructure.

Project type
Hydropower
Service
Feasibility, revised feasibility and final design
ABOUT THE PROJECT

Safe design. Long-term value.

Feasibility, revised feasibility and final design services for Kasımlar Dam and Hydropower Plant in Isparta. The operator describes the Kasımlar I–II scheme as 100 MW, with two powerhouses, two weirs, a 90 m RCC dam and 15 km of tunnels.

90 mRCC dam height — operator record
100 MWInstalled capacity — I–II scheme
15 kmTotal tunnel length
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.