04 / PROJECT DETAIL
Karakurt Dam and Hydropower PlantKars
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Technical assessment for Karakurt Dam and Hydropower Plant on the Aras River in Kars. Published operator information from ENERGO-PRO records a total installed capacity of 97 MW.
97 MWInstalled capacity
Technical assessmentService
HydropowerEngineering discipline
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.