HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Kandil Dam reservoir viewed from the shore — operator photograph
04 / PROJECT DETAIL

Kandil Dam and Hydropower PlantKahramanmaraş

Lasting value in water infrastructure.

Project type
Hydropower
Service
Final and detailed designs
Client
ENERJİ-SA
ABOUT THE PROJECT

Safe design. Long-term value.

Final and detailed designs for Kandil Dam and Hydropower Plant in Kahramanmaraş. The Hidromark archive describes a 101 m concrete-face rockfill dam designed for power generation.

101 mArchived design height
Concrete-face rockfillDam type
Final and detailed designsService
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an earthfill reservoir and irrigation outlet