
04 / PROJECT DETAIL
Cide Weir and Hydropower Plant
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Hydropower final design services for Cide Weir and Hydropower Plant.
Hydropower final designService
HydropowerEngineering discipline
Hydropower ProjectsService area
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.


