04 / PROJECT DETAIL
Çermikler Dam and Hydropower PlantSivas
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Final and detailed designs for the 25 MW Çermikler Dam and Hydropower Plant in Şarkışla, Sivas. The archived design describes a composite concrete and clay-core rockfill dam with a height of 42 m and a crest length of 146.86 m.
42 mArchived design height
Concrete + clay-core rockfillDam type
25 MWInstalled capacity
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.