HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Çermikler Barajı ve HES — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Çermikler Dam and Hydropower PlantSivas

Lasting value in water infrastructure.

Project type
Hydropower
Service
Final and detailed designs
Client
Övünç Enerji Üretim A.Ş.
ABOUT THE PROJECT

Safe design. Long-term value.

Final and detailed designs for the 25 MW Çermikler Dam and Hydropower Plant in Şarkışla, Sivas. The archived design describes a composite concrete and clay-core rockfill dam with a height of 42 m and a crest length of 146.86 m.

42 mArchived design height
Concrete + clay-core rockfillDam type
25 MWInstalled capacity
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an earthfill reservoir and irrigation outlet