HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Cemel Weir and Hydropower Plant — project site photograph
04 / PROJECT DETAIL

Cemel Weir and Hydropower PlantNevşehir

Lasting value in water infrastructure.

Project type
Hydropower
Service
Final and detailed designs
Client
ZEYNEP Enerji
ABOUT THE PROJECT

Safe design. Long-term value.

Final and detailed designs for Avanos Weir and Cemel Hydropower Plant in Avanos, Nevşehir. The archive records an installed capacity of 27.12 MW, a radial-gated weir and a structure height of 29 m.

29 mArchived structure height
Radial-gatedWeir type
27.12 MWInstalled capacity
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an intake, penstock and hydropower plant