04 / PROJECT DETAIL
Cemel Weir and Hydropower PlantNevşehir
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Final and detailed designs for Avanos Weir and Cemel Hydropower Plant in Avanos, Nevşehir. The archive records an installed capacity of 27.12 MW, a radial-gated weir and a structure height of 29 m.
29 mArchived structure height
Radial-gatedWeir type
27.12 MWInstalled capacity
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Water and energy
Integrated assessment of flow regimes, available head and the power generation system.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.