HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
04 / PROJECT DETAIL

Çankırı Central Drinking Water Pipeline Hydropower ProjectÇankırı

Lasting value in water infrastructure.

Project type
Hydropower
Service
Drinking water pipeline hydropower construction works
Status
Ongoing
ABOUT THE PROJECT

Safe design. Long-term value.

Construction works for the hydropower project on the central drinking water pipeline in Çankırı are ongoing.

Drinking water pipeline hydropower construction worksService
HydropowerEngineering discipline
Hydropower ProjectsService area
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of a drinking-water source, conveyance and treatment