HIDROMARK / SEARCH

Explore our engineering experience.

EXPLORE HIDROMARK
Akıncı Regülatörü ve HES — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Akıncı Weir and Hydropower PlantTokat

Lasting value in water infrastructure.

Project type
Hydropower
Service
Hydropower final design
ABOUT THE PROJECT

Safe design. Long-term value.

Final design for Akıncı Weir and Hydropower Plant on the Kelkit River between Reşadiye and Niksar in Tokat. Aydem’s technical release records 99 MW installed capacity and a 40 m diameter surge chamber.

99 MWInstalled capacity
40 mSurge chamber diameter
Hydropower final designService
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an intake, penstock and hydropower plant