
04 / PROJECT DETAIL
19 Mayıs DamSamsun
Lasting value in water infrastructure.
ABOUT THE PROJECT
Safe design. Long-term value.
Final and detailed design services for 19 Mayıs Dam in Samsun. The municipal project page published in 2022 describes the drinking-water and irrigation dam as 90 m high from foundation, with reservoir volume of 43.44 million m³.
90 mHeight from foundation — municipality, 2022
43,44 hm³Reservoir volume — municipality, 2022
Final and detailed designService
ENGINEERING APPROACH
From scientific analysis to practical solutions.
Our multidisciplinary approach brings technical, environmental and economic criteria together.
Our technical approach- 01
Hydrology and ground conditions
Integrated assessment of catchment data, foundation conditions and the interaction between structure and water.
- 02
Engineering design
Developing coherent design decisions with safety, feasibility and resource efficiency in view.
- 03
Technical coordination
Coordinating disciplines, drawings and technical documentation within the scope of the assignment.


