Çaykara Regülatörü ve HES — enhanced view based on the reference photograph
04 / PROJECT DETAIL

Çaykara Weir and Hydropower PlantTrabzon

Lasting value in water infrastructure.

Project type
Hydropower
Service
Final and detailed designs
Client
REDAŞ Elektrik Üretim Dağıtım
ABOUT THE PROJECT

Safe design. Long-term value.

Final and detailed designs for a 34 MW hydropower scheme in Çaykara, Trabzon. The source design specifies a solid concrete weir with a crest height of 5.60 m for the power generation scheme.

5.60 mWeir height
Solid concreteWeir type
34 MWInstalled capacity
ENGINEERING APPROACH

From scientific analysis to practical solutions.

Our multidisciplinary approach brings technical, environmental and economic criteria together.

Our technical approach
  1. 01

    Water and energy

    Integrated assessment of flow regimes, available head and the power generation system.

  2. 02

    Engineering design

    Developing coherent design decisions with safety, feasibility and resource efficiency in view.

  3. 03

    Technical coordination

    Coordinating disciplines, drawings and technical documentation within the scope of the assignment.

Engineering illustration of an intake, penstock and hydropower plant